Of the few most frequently asked questions, one is pertaining to when can one install a Reticulation System to prevent termites? Sometimes our prospective clients ask us that they are already at the stage of laying the tiles, are they already too late to install the system?
Good news is TermiPore Reticulation System can be installed at different stages of construction, Before, During, & After Construction too.
You can secure your property at foundation level. This can be done at foundation/plinth level, to complement the statutory requirement of soil treatment. Along with the standard industry norm of soil treatment, we recommend that you install this system. Since this will enable you to protect your property forever, even after the construction is over. After laying the pipes under-ground at foundation level, you bring the junction box above ground and inject pesticides at intermittent intervals. Initially, for the 1st 3-4 years, when the construction and interior work is on and lot of material and agencies are at work on site, you can opt to inject medicines every year. Once the property is ready you can easily inject termiticides once in 2/3 years, so that no termite can enter your premises from under the ground. With minimal investment, you can secure your property against damage and loss due to termites, at foundation level.

Pic of Installation at plinth level
Install at plinth/ground level

If you have already started construction above the foundation, no worries at all. You can still install this system, under the tiles, before laying them. This is helpful even on higher floors. We offer pipes of varying sizes, and you can select a pipe that easily fits in the place between the floor bed and tiles.
Pic of Installation before laying floor tiles
Install During Construction
‘Strengthen During Tiling’
Install before laying floor tiles
A C )After Installation
Ev Even if you have missed installing TermiPore Reticulation System at
plinth level or below the tiles, you can still protect your property after construction,
by installing the pipes around the periphery of your premises and inside the
boundary wall.
Pic of Installation around the periphery
‘Defend after Construction’ Install around the periphery
As mentioned earlier, at TermiPore, you can get pipes of varied sizes and we offer customization too. For product details, click on: www.buy.termipore.com
We also provide technical training for installation. For details on installation click on: www.termipore.com